Licence RBQ 5718-1380-01 · Montreal · Laval · North Shore

Projects

Public, institutional and residential projects delivered with respect for standards, schedules and occupants.

Sealed mechanical room for decontamination

Concordia University

Decontamination and cleaning under asbestos conditions
Two-storey school with its exterior brick cladding being removed, fenced work area at ground level

École René-Guénette

Exterior brick removal
Stripped building with a protective enclosure at ground level

Habitations Barclay

Foundation parging removal under asbestos conditions
Stairwell fully sealed in polyethylene for high-risk asbestos work

École René-Guénette

Mobilization for high-risk asbestos work
Interior stripped down to the structure

King-Edward

Interior strip-out under asbestos conditions
Basement with stone walls, ceiling stripped down to the joists after removal

Pincourt

Ceiling strip-out under asbestos conditions
Large space fully stripped: concrete slab, exposed ducts and sprinklers

5100 de Maisonneuve

Complete interior strip-out
Sealed work area: textured ceiling opened to the joists, HEPA air scrubber and scaffolding

École René-Guénette

Trench under asbestos conditions
Interior steel structure to be demolished in a high-ceilinged commercial space

900 Beaulac Street

Steel structure demolition
Gymnasium with one full wall sealed in polyethylene and an access door to the work area

Piscine communautaire Notre-Dame-de-Grâce

Gymnasium mobilization for asbestos decontamination
Room sealed in polyethylene, ceiling opened to the joists and block wall exposed

Hartland-Outremont

Openings under asbestos conditions for construction work

Let's talk about your project.

Request a quote(514) 561-5476Send your plans or photos — reply within 24 h.
CallQuote