Decontamination
Five contaminants, the same rigour: identification, containment, removal and final verification, to current standards.

Asbestos
Sprayed insulation, pipe lagging, plaster, tiles, textured ceilings: removal in a sealed area based on the risk level.02Lead
Lead paints and coatings: stripping and demolition with dust control.03Mold
Removal of contaminated materials and clean-up after water damage.04Vermiculite
Safe removal of loose-fill insulation from attics and walls.05Pyrite
Demolition and removal of affected materials before corrective work.Contaminated or shut-down site?
We also take over projects midway, when contamination was discovered too late.
01
Takeover and final clean-up of contaminated sites
We are often called in after another company demolished without accounting for asbestos. We seal the area, remove contaminated debris, HEPA-vacuum every surface and have a final air test done, so the project can restart on a sound footing.
Learn more →02
Work following a CNESST stop-work order
Has the CNESST shut down your site because of a contaminant? We are used to the paperwork and to managing a site shut down by the CNESST: we take charge of the required corrective work and the documents to produce, so you can apply to resume the project.
Learn more →Our method
- 01Site visit and samplingWe assess the site and identify hazardous materials.
- 02Quote within 24 hA precise scope, a clear price, a realistic schedule.
- 03Containment and workSealed area, negative pressure and code-compliant procedures.
- 04Air test and handoverHEPA cleaning, final check, space ready for what comes next.